LIFEPOINTE BAPTIST CHURCH – STAGE 2 RECONSTRUCTION

SECTOR: FAITH BASED
STATUS: IN CONSTRUCTION 
______________________________________________________________________________________________________________________________________

Plexxcon is delivering the Stage 2 reconstruction of Lifepointe Baptist Church as part of a $17m reconstruction following damage to the existing facility due to a natural disaster. The works cover the full reinstatement of the building: structural works, building fabric, internal fitout and building services. The aim is to return the church to a safe, functional and modern space for its congregation and the wider community.

The scope includes the complete fitout of the Reception and Bathroom areas. It also includes new aluminium shopfront glazing, with a glazed entry door and windows, to give the building a refreshed street presence and more natural light. A new internal staircase is being built to improve circulation and access between levels.

Stage 2 also adds new infrastructure to the campus. A new covered laneway structure will link the car park to a new youth building, giving all-weather pedestrian access and a stronger connection across the site.

The church remains in use, so the works call for careful staging, close coordination with church stakeholders and attention to the safety of people on site.