In this Sight Unseen episode, Plexxcon director Pete de Vuyst and Tahlia Snell explain where the name Plexxcon comes from (complex construction, with two X’s), why the business chases the jobs other builders avoid, and how showing the full methodology up front builds trust with body corporates, project managers and engineers.
Listen: Watch on YouTube · Sight Unseen with Plexxcon on Spotify
In this episode
- What “complex construction” means: tight access, live sites and problems that haven’t even been designed yet
- Why there are two X’s in Plexxcon
- Early contractor involvement on a leaking roof project that had been stuck in design for years
- Why band-aid fixes, like layers of silicone, keep failing, and what a proper fix looks like
- How detailed methodology in tenders, with staging, access paths and marked-up diagrams, makes a submission easy to understand
- Why more clients now come to Plexxcon through engineer referrals
Key takeaways
- Committees often spend money on investigations and patch repairs before funding a proper fix. A full scope and a managed project costs less over time than repeated band-aids.
- A clear methodology lets a client compare what each builder will actually deliver, not just the price.
- Early contractor involvement helps when a remedial problem is understood but nobody has worked out how to build the fix.
Chapters
- 00:00 Why Plexxcon
- 01:30 What complex construction means
- 03:20 Why we take the jobs others avoid
- 05:30 Transparency as methodology
Related: Plexxcon Remedial · Body corporate & strata works
Episode transcript
Transcript lightly edited for readability.
Read the full transcript
Tahlia, how did you come up with the name Plexxcon? I don’t know, Peter. How did you come up with the name Plexxcon?
Well, it was a very complex process actually. When I was first kicking off the business, I was thinking about what to call it. Peter’s Construction Company, Peter and Co. Plexxcon was one of those names that came to me after six months of thinking.
It seems simple now, because the jobs we do are always in complex environments. So you’ve got your “plex”, and we’re a construction company. Complex construction, reversed: Plexxcon.
I love it. And you just added the extra X for the fun of it?
Well, it wasn’t actually for fun. The reason for the two X’s is that I couldn’t register the name with one X, because another company down south had already taken it, even though they don’t use it. So what’s better than one X? Two X’s. Most of our stuff is double complex.
What it does create is that when people see the name written down, nine times out of ten they say “Plexicon”. Absolute pet peeve. Our new rule is anyone in the business who calls it Plexicon owes a carton.
So what is complex construction?
For us, it’s the projects nobody else really wants to do. The challenging ones that don’t fit the standard bill. It’s not just a fit-out. It’s tight access, or “how in the world are we actually going to do this?” A lot of the time we’re in the office scratching our heads with the estimators and project managers, piecing it together, because we get a few projects that aren’t even designed. It’s: we know this is the problem, we have no idea how to fix it, can you do it?
I had one of those the other day. A tower came to us and said, we need to replace all our roofs that are leaking. We’ve had four people come to us and no one has got anywhere. Can we engage you to design it, price it and do it?
Early contractor involvement. They’d been spending money with other people and it was sitting in design, going around in circles for years, and the unit owners were getting frustrated with constant leaks in their apartments.
Committees will spend money on people investigating and providing band-aid fixes. Until they’re ready to spend the proper money to fix it as it should be. Then we get involved and undertake full roof replacements, fix the structure, fix the concrete, and manage it as a project, rather than having a guy with a silicone gun walk around and go “there’s a hole, let’s put some silicone on it”. That’ll last six months.
I had a call from a lady up the coast. She said maybe they just needed some more silicone, they’d had heaps of people do silicone. It turns out it’s the planter boxes and the podium pool level leaking into the basement car park.
The issue is more than silicone. When you get 17 layers of silicone on there, the whole glob starts falling off. Then we come and fix it properly. That’s a very common occurrence in our jobs.
One of the main things we bring to the table is our approach and experience in how to actually do the project. Our methodology.
People have been told by other body corporates, project managers, or through social media that we’re trustworthy and know what we’re doing. Going directly to site and explaining the issues helps, especially with the mum-and-dad remedial clients.
Even in our tender submissions we go further than most in explaining the step-by-step approach. We’ll have diagrams marked up, go through the staging of the project, and show fence lines and access pathways.
We had feedback on a tender at Kangaroo Point. The client-side project manager saw the other builders’ numbers, but ours was the only tender he could actually understand, because we’d spelt out exactly what we were doing. We weren’t necessarily comparable on price, but he knew what we were going to deliver.
As a builder we want to be seen as the reliable, experienced builder that actually works with people. We’d rather make a dollar off a hundred jobs than a hundred dollars off one job.
Being around five years now, we’re getting more and more clients coming to us directly saying, we’ve been to someone else and been told to come to you because you can fix it.
There’s been lots of feedback, especially from engineers recommending us, even engineers we haven’t worked with directly. Clients don’t know where to start, so engineers are doing their own research and coming across us.
Talk to Plexxcon
Got a complex remedial, live-site or design and construct project in Queensland? Get in touch with the team, or browse recent projects.


